SSP Engineering Home

Category

Design Coordination

1 article

The Holes Nobody Drew: Scheduling Penetrations in Fabricated Enclosures

The Holes Nobody Drew: Scheduling Penetrations in Fabricated Enclosures

Cable entries, gland plates, drain points and sensor bosses are rarely the reason an enclosure is designed, and almost always the reason it fails. A cutout and penetration schedule fixed at design review is cheaper than a drill on site and considerably cheaper than the warranty claim that follows one.